Mine Site Emergency Pipeline Repair.

6 Mar 2012

Our team were called to urgently repair a fractured concrete lined pipe system that was being used to drain a surface lake at a local mine site, see our solution to this failure below.

 

After inspecting the pipeline we urgently fabricated an offset concrete lined pipe adaptor to be fitted on site, the fractured section of pipe was removed and fitted with this solution to keep the mine operational.